Refinery & Petrochemical
Bartlett Cocke Industrial understands how to work safely “inside the fence!” Our list of client relationships include many well-known refining and petrochemical clients like ExxonMobil, Chevron Phillips, Shell, and Dow Chemical just to name a few. Bartlett Cocke Industrial will team up with other specialized designers, vendors and lower-tier subcontractors to design and construct a blast resistant building, administration or office building, a maintenance building, shop, or warehouse building or any other type of building need that you may have. We understand and value the importance of the added safety precautions that are put into place in a plant environment.
CLIENT | PROJECT DESCRIPTION | LOCATION |
---|---|---|
VALERO MCKEE CENTRAL CONTROL BUILDING 12,528 SF state-of-the-art single story Blast Resistant masonry control building with independent structural steel frame, split-faced CMU block facade and redundant mechanical system, mission critical, and emergency power systems. |
Sunray, Texas |
|
VALERO ARDMORE ADMINISTRATION BUILDING 42,000 SF two story administration building with independent structural steel frame and architectural metal panel façade with concrete wainscot base. The building was constructed on the side of a hill that overlooks the refinery. The programmatic functions include offices, conference rooms, a fitness center, a wellness clinic, storage areas, and other miscellaneous support spaces. Offices surround the perimeter with open workstations in the middle, with circulation throughout. Vertical circulation consists of two sets of stairs and one hydraulic elevator, as well as extensive landscaping and retaining wall package. |
Ardmore Refinery, Texas |
|
VALERO THREE RIVERS ADMINISTRATION BUILDING 44,000 SF two story administration building with independent structural steel frame and architectural metal panel façade with concrete wainscot base. The programmatic functions include offices, conference rooms, a fitness center, a wellness clinic, storage areas, and other miscellaneous support spaces. Offices surround the perimeter with open workstations in the middle, with circulation throughout. Vertical circulation consists of two sets of stairs and one hydraulic elevator, as well as extensive landscaping and underground storm sewer water package. |
Three Rivers Refinery, Texas |
|
INEOS BATTLEGROUND ADMINISTRATION BUILDING 74,000 SF state of the art four story Blast Resistant office building, including Cafeteria with food service, consisting of a reinforced concrete slab, independent structural steel frame, curtain wall and architectural metal panel facade. The project includes site improvements such as landscaping, ramps, monument signage, and parking. |
La Porte, Texas |
|
INEOS CHOCOLATE BAYOU ADMINISTRATION BUILDING 74,000 SF state of the art four story Blast Resistant office building, including Cafeteria with food service, consisting of a reinforced concrete slab, independent structural steel frame, curtain wall and architectural metal panel facade. The project includes site improvements such as landscaping, ramps, monument signage, and parking. |
Alvin, Texas |
|
INEOS BMC PILOT LAB CEU-177 DECOMM. AND MOVE PROJECT Relocation and refurbishment of a Catalyst Lab, an Analytical Lab, and the CEU-177 Pilot Plant from Naperville, IL to the Battleground Manufacturing Complex in La Porte, TX. In general, the work includes demolition of the lab areas and OSBL areas, air gapping of mechanical services and utilities, construction of exterior shed areas composed of reinforced concrete slab, CMU walls, process equipment, piping, instrumentation, interior renovation of existing lab areas, construction of new lab areas, construction of a pilot plant enclosure, installation of new process equipment, piping, instrumentation, and new HVAC, electrical, plumbing, and fire suppression systems. |
La Porte Texas |
|
CHEVRON PHILLIPS CHEMICAL, CEDAR BAYOU INFRASTRUSTURE Construction of five new buildings to support plant expansion, including: 34,000 SF two-story structural concrete administration building wing; 9,500 SF single story engineered metal MHO building; 23,300 SF single story engineered metal petrochemical office building; 4,100 SF single story metal petrochemical shop expansion; 1,300 SF single story brick veneer main guard house building |
Baytown Texas |
|
CHEVRON PHILLIPS CHEMICAL, CEDAR BAYOU USGC ETHLYENE 1594 PROJECT PERMANENT METAL BUILDING Construction of twelve new pre-engineered metal structures to support the USGC Ethylene 1594 project, including: three Generator Shelters totaling 1,886 SF; one Process WW Area Belt Press Shelter totaling 600 SF; five Operator Shelters totaling 600 SF; two Compressor Shelters totaling 23,400 SF and one Operator Test Station totaling 200 SF |
Baytown Texas |
|
CALUMET SAN ANTONIO REFINING Interior finish-out of office building |
San Antonio Texas |
|
CHEVRON PHILLIPS CHEMICAL, SWEENY CONTROL BUILDING & LABORATORY 12,000 SF blast resistant concrete precast panel control building and 9,000 SF laboratory |
Sweeny Texas |
|
CHEVRON PHILLIPS CHEMICAL, SWEENY ADMINISTRATION BUILDING EXTENSION Construction of new 43,000 SF single story concrete tilt-wall administration building |
Sweeny Texas |
|
CHEVRON PHILLIPS CHEMICAL, SWEENY ADMINISTRATION BUILDING EXTENSION (EARLY WORK) Underground site electrical utilities and new employee parking lot in support of administration build addition |
Sweeny Texas |
|
PHILLIPS 66 COMPANY, SWEENY PLANT New High Voltage Shop and East End Maintenance shop |
Old Ocean Texas |
|
EXXONMOBIL FRIENDSWOOD TEST FACILITY, GLOBAL REAL ESTATES & FACILITIES GROUP Construction work on seven projects at the Friendswood complex, including: building a new 4,000 SF MIC laboratory and building, re-roofing, AHU replacements, electrical and septic upgrades for selected buildings |
Friendswood Texas |
|
EXXONMOBIL REFINERY LAB VENTILATION UPGRADES 30,000 SF renovation of existing refinery lab |
Baytown Texas |
|
CHEVRON PHILLIPS CHEMICAL, PORT ARTHUR CONTRACTORS COMPOUND 22,338 SF new office and maintenance facility |
Port Arthur Texas |
|
CHEVRON PHILLIPS CHEMICAL, MAINTENANCE / E&I BUILDING 6,700 SF demolition of existing building; remove and replace exterior siding and rook; electrical and utility upgrades |
Baytown Texas |
|
EXXONMOBIL PARK STREET LAB RENOVATIONS Upgrades/renovations to an existing unit lab facility |
Baytown Texas |
|
FLINT HILLS RESOURCES 42,000 SF Siting/Hardening projects on two buildings |
Port Arthur Texas |
|
CHEVRON PHILLIPS CHEMICAL, PORT ARTHUR CONTROL BUILDING 11,023 SF new blast resistant central control building |
Port Arthur Texas |
|
CHEVRON PHILLIPS CHEMICAL, PORT ARTHUR MOB2/MVA 14,570 SF two-story new pre-engineered metal building for maintenance personnel to include: offices, elevator and general facilities |
Port Arthur Texas |
|
CHEVRON PHILLIPS CHEMICAL, SWEENY NGL UNIT 22 CONTROL BUILDING EARLY DEMOLITION & SITE PREP 90,000 SF site preparation, demolition and underground utilities for the new NGL Unit 22 Control building |
Sweeny Texas |
|
CHEVRON PHILLIPS CHEMICAL, SWEENY NGL UNIT 22 CONTROL BUILDING Construction of new 11,524 SF blast resistant concrete precast panel control building |
Sweeny Texas |
|
CHEVRON PHILLIPS CHEMICAL, SWEENY UNIT 24 CONTROL BUILDING 10,884 SF blast resistant control building |
Old Ocean Texas |
|
KIRBY INLAND MARINE BARGE WASHING FACILITY | Houston Texas |
|
KIRBY INLAND MARINE DORMITORY & GALLEY 14,500 SF; New dormitory |
Houston Texas |
|
ROHM & HAAS HURRICANE SHELTER & EMERGENCY OPERATIONS FACILITY 7,318 SF; New hurricane shelter and emergency operations facility |
Houston Texas |
Energy
Today’s energy and R&D facilities utilize much different designs than those of ten years ago. The most current trend is to house the laboratories inside the same facility as the commercial office space, serving two purposes within a single building. Bartlett Cocke Industrial understands these new trends and works closely with our energy clients to achieve the maximum efficiency of combined office and laboratory space.
CLIENT | PROJECT DESCRIPTION | LOCATION |
---|---|---|
HALLIBURTON MULTICHEM BUILD-OUT 25,000 SF; Demolition/renovation of existing office to lab space |
Houston Texas |
|
ARAMCO SERVICES COMPANY RESEARCH CENTER 89,000 SF office space, 14,000 SF lab space; Selective demolition and renovation of existing office and lab spaces |
Stafford Texas |
Manufacturing
Safety is the priority concern and Bartlett Cocke Industrial understands this. In addition to safely building your manufacturing plant, Bartlett Cocke Industrial provides ongoing maintenance services to our clients to ensure that equipment performs at its peak.
CLIENT | PROJECT DESCRIPTION | LOCATION |
---|---|---|
TOYOTA MOTOR MANUFACTURING TEXAS 2,223,626 SF; New automotive manufacturing facility and parking for 2,000 employees |
San Antonio Texas |
|
ALBANY ENGINEERED COMPOSITES EXPANSION 98,513 SF; Aircraft manufacturing facility addition |
Boerne Texas |
|
TEXAS PORT RECYCLING PLANT Steel recycling plant |
Houston Texas |
|
MOGAS OFFICE EXPANSION – SOUTH BUILDING 20,080 SF office building renovation with new parking area, associated landscaping and utilities |
Houston Texas |
|
MOGAS OFFICE EXPANSION – PHASE IIC 1,155 SF; manufacturing office expansion, warehouse paving upgrade and landscaping |
Houston Texas |
|
MOGAS INDUSTRIES PARKING GARAGE COMPLETION 89,208 SF; Structural repairs and punchlist completion on existing garage |
Houston Texas |
Distribution
Effective use of space is a priority for distribution facilities. Bartlett Cocke Industrial works very closely in the design of these facilities to ensure maximum efficiency in space planning, resulting in better use of time, higher productivity and greater value. We ensure that no space is wasted space.
CLIENT | PROJECT DESCRIPTION | LOCATION |
---|---|---|
PORT FREEPORT, DECONSTRUCTION OF TRANSIT WAREHOUSE 2 | Freeport Texas |
|
UPS BAYTOWN EXPANSION | Baytown Texas |
|
REPUBLIC NATIONAL DISTRIBUTING COMPANY HEADQUARTERS & DISTRIBUTION FACILITY (Formerly Block Distributing Co.) 371,000 SF; New headquarters & distribution facility |
Schertz Texas |
|
PRUDENTIAL OVERALL SUPPLY CO. FACILITY EXPANSION 11,004 SF; Clean-room laundry facility expansion, including on-site water treatment facility to treat the effluent created by the laundering process |
Round Rock Texas |
|
SUNBELT SPORTSWEAR DISTRIBUTION CENTER 144,300 SF; New distribution center |
San Antonio Texas |
Food & Beverage
Food and beverage manufacturers continuously collaborate with producers to ensure safer, healthier, better-tasting, and easier to produce products. With the speed and unpredictability in the market, Bartlett Cocke Industrial is always there to implement those changes and keep the manufacturing plants on the cutting edge of technology, ultimately impacting the bottom line.
CLIENT | PROJECT DESCRIPTION | LOCATION |
---|---|---|
COCA-COLA ENTERPRISES BUILDINGS 1 & 3 225,000 SF; Building 1: 200,000 SF; New construction; Building 3: 25,000 SF; Remodel |
San Antonio Texas |
|
H.E. BUTT GROCERY CO. PRODUCE FACILITY 166,000 SF; New produce food storage and ripening facility |
San Antonio Texas |
|
H.E. BUTT GROCERY CO. HOUSTON RETAIL SUPPORT BAKERY FACILITY 110,000 SF; Renovation of existing facility and addition of a new commercial bakery. |
Houston Texas |
|
H.E. BUTT GROCERY CO. HOUSTON RETAIL SUPPORT CENTER Milk plant manufacturing upgrades and production line modifications |
Houston Texas |
Service Business Unit
The Bartlett Cocke Industrial Service Business Unit provides superior Facilities Building and Maintenance Service Work for capital building projects, civil and structural projects throughout Texas and the Gulf Coast region. We serve our clients as a single point-of-contact for planning, design, and construction services. The streamlined approach of our Service Business Unit drastically reduces the amount of effort and paperwork required to maintain our client’s building facilities.
CLIENT | PROJECT DESCRIPTION | LOCATION |
---|---|---|
CHEVRON PHILLIPS CHEMICAL, CEDAR BAYOU EF751 Oil Containment |
Baytown Texas |
|
SHELL DEER PARK New blast door installation |
Deer Park Texas |
|
EXXONMOBIL BAYTOWN PLANT BTEC metal building construction |
Baytown Texas |
|
EXXONMOBIL MONT BELVIEU Lab remodel |
Mont Belvieu Texas |
|
CHEVRON PHILLIPS CHEMICAL, SWEENY Parking lot lighting project |
Sweeny Texas |